Kee Safety

National Accounts

We take pride in in engineering, manufacturing, and supplying trusted fall protection solutions on a state or national level. Our extensive expertise in the fall protection industry allows us to cater to diverse businesses with facilities spread across the country. Whether you have a single national account or multiple facilities nationwide, we have the capabilities to provide top-notch rooftop safety management services tailored to your specific needs.

 

National Accounts Map Yellow

National & Multifacility Accounts Program

  • Kee Safety will mitigate risk and reduce liability in your network by leveraging our nationwide team of expert safety consultants to develop a consistent, standardized fall protection program achieving OSHA and local code compliance for your facilities.
  • Kee Safety has the broadest portfolio of fall protection solutions in the industry.
  • We design, engineer, manufacture, supply, and install (optional) best-in-class safety systems.

Exploring Rooftop Fall Protection Systems

Logic Based Approach to Danger Zones and OSHA's Safety Guidelines with trusted fall protection systems

1 Access Points

Access points are the most frequented hazard on any rooftop. Workers are exposed to this risk twice - every time they enter and exit the roof to perform tasks. If a worker is required to access the roof 8 times per year, they are exposed to the access point hazard 16 times. OSHA requires that all ladders and hatches be secured with a self- closing gate and safety-compliant railing.

2 Rooftop Openings2

Openings are the most often overlooked hazard, so they are extremely critical to protect. OSHA considers skylights to be a hole in the rooftop which is why Kee Safety evaluates all rooftop openings as a serious risk concern. Statistically, more people fall through skylights than over the open edge of a roof.

As a worker is traversing the middle of the rooftop, they have a false sense of security. Operating far from the roof edge, carrying equipment, or focused on the job at hand, it is easy to misstep and fall through an unprotected skylight opening.

3 Unprotected Edges

The edge of the roof is the most visible hazard, and typically the hazard most people want to protect first. Proximity to the roof edge is a significant factor in identifying the likelihood of an accident occurring. OSHA regulations cite that any building where work is performed within 15’ of an open roof edge, each worker must be protected from falling with a guardrail system or other approved safety system. Frequently, a worker’s purpose for accessing the roof is to service a piece of equipment. It is important to document if the equipment too close to an unprotected edge.

4 Obstacles2

Understanding the path that workers take across the roof is necessary for a complete fall protection assessment. Obstacles on the roof force workers to unsafely climb over or step around the obstructions, often placing workers at risk by walking too close to the roof edge and slipping off.

We Assess Risk Based on 2 Factors:


1. Severity of Injury: In fall protection assessment, the severity of a fall-related injury is always assumed to be life-threatening.


2. Likelihood: The greatest predictor for the likelihood of an accident occurring is to review the frequency of exposure to the hazard on the roof.

Risk = Severity X Likelihood: We prioritize our Risk Assessment based on the critical danger and how frequently workers are exposed.

Benefits of Enterprise Partnership with Kee Safety

A One-Stop-Shop For All Fall Protection Compliance Solutions

Comprehensive, Standardized Risk Assessments Of All Your Facilities At No Cost.

Preferred Pricing Secured By Contract

Enhanced Warranties

Dedicated Project Support

Responsive, Local Expert Consultants

It’s As Easy As This:

Sign Up Below

Fill out the form below, letting us know the best way to reach you.

We'll Be In Touch

You’ll be contacted promptly for coordination of a brief introductory conference call where a Senior Consultant will explain our methodology and approach to separating people from hazards

In Person Visit

Schedule in-person, on-site safety assessments with our National team of expert safety consultants at your convenience.

Comprehensive Solution

Receive a standardized, comprehensive safety assessment detailing hazards identified and proposed solutions.

金属屋面护栏

Kee Safety is your trusted partner in providing multifacility fall protection. Our Team of dedicated professionals are standing-by ready to provide expert guidance, support, and customized solutions for your enterprise.

Please fill in your details below and we’ll be in touch shortly.